CONSTRUCTION PROGRESS UPDATE – ARMADALE ALTERATIONS/ADDITIONS

The bathrooms at our Armadale addition are ready for the installation of the 3.0×1.5m porcelain panels by ‘Maximum’. This is an extremely specialized tiling field and the guys at MCM tile and stone are doing a terrific job with their professionalism and can do attitude. We can’t wait to see the finished result.

 

 

 

Here below is a glimpse of the polished concrete in the living/dining area:

 

View out onto the alfresco and pool

 



CONSTRUCTION PROGRESS – ELSTERNWICK ALTERATIONS/ADDITIONS

Things are really starting to take shape with great progression being made at our latest Elsternwick project.

Frames are nearing completion with windows and roof due to be installed in the coming weeks.



CONSTRUCTION PROGRESS – ESSENDON ALTERATIONS/ADDITIONS

Our alterations and two storey additions project in Essendon is nearing completion.

Things are looking great as our clients get ready to move back into their family home.

Stay tuned for the final, completed project being photographed over the coming months.



CONSTRUCTION PROGRESS UPDATE – ARMADALE ALTERATIONS/ADDITIONS

Framing and brickwork is now complete at our Armadale Addition.

The project is now ready for plaster to be installed.

 

 

 



CONSTRUCTION PROGRESS UPDATE – BRIGHTON EAST ALTERATIONS/ADDITIONS

Construction progress is well under way.

Structures on the new second floor is complete.

check this out:

Let’s go up, shall we?

image 3

 

image 5

 

image 7

image 2

Future skylights above alfresco area:

image 6

view up from alfresco!

image 10

 

Stay tuned there is more to come!

*Click here to see previous photos.



Construction complete for Hampton House

Construction of this new double storey house in Hampton is complete.

Fantastic work done by the builder/owner!!

Nicol Street, Hampton 2

What a great idea to combine timber block work and cement sheet based product!

Entrance Nicol Street

**To see photos from the work in progress back then, check out our previous post here



Contruction Progress – Caulfield South Addition

Last week, we visited our Caulfield South Addition.
Construction is progressing beautifully and smoothly by Adam Construction Team.

This project involves:

– Internal alterations and re-modelling to the existing house
Imperial Ave 1

Imperial Ave 2

Imperial Ave 4

– as well as a contemporary styled rear addition
Imperial Ave 8

Imperial Ave 6

Imperial Ave 9

Imperial Ave 11

Imperial Ave 12

 



Construction Progress – Elsternwick 2 Addition

Construction is underway for a new Elsternwick Addition.

See the progress photos below:

 

pic 2

pic 3

pic 4



Construction Progress: Yarraville Alterations & Addition

Construction progress has been a quick and smooth process since our last post in late December.

yarraville-02

yarraville-05

yarraville-08

 


 

 

 

Construction progress in late December:
kidman-5

kidman-4

kidman-3

 



Construction Progress: Hampton House

hampton-01 hampton-02 hampton-03


3 Nicol Street_View02 3 Nicol Street_View04



Construction Progress: Bentleigh Addition

We’re very excited about this particular project, which is progressing beautifully. Our favourite feature is the huge glazed panels (pictured below) looking into the internal courtyard, with a view of the newly cladded, rear of the existing house, and in time, a Japanese Maple. This room will be a large, light filled living space with great visual connections to the outdoors. We can’t wait to see the finished product.

rose-01

 

rose-06

rose-05

rose-04

rose-03

rose-02

 


 

Rose Street_04


 

 

See more 3Ds and photos of construction progress for this project here.







Construction Progress for Blairgowrie Residence

07050201060304



Construction Progress: Bentleigh Addition

Yesterday we checked up on the progress for our Bentleigh Addition. Construction for this project commenced in July, so after just over three months into the build, it’s progressing very quickly.

Rose Street_040102030504


Rose Street_01Rose Street_02Rose Street_05


For more progress photos, see latest blog for this project here

 



Construction Progress: Edithvale Residence

This new home down near the beach in Edithvale is well under way, with most of the structure already up.

The client is wrapped with its progress so far, a mere six weeks into construction. The roof should be going on this week, and the hope for completion by Christmas seems pretty realistic at this stage.

050203bristol-vert06


 

 