CONSTRUCTION PROGRESS – ARMADALE ALTERATIONS/ADDITIONS

Despite our unseasonable Melbourne weather, construction progress is going well!

Steel is up…starts to take shape!!

image-1-retouched

 

image-2-retouched

 

image-3-retouched

Two weeks ago, we have posted photos of slab poured… click here !

 

 

 

 

 

 

 

 



CONSTRUCTION PROGRESS – ARMADALE ALTERATIONS/ADDITIONS

Construction progress is well under way with our new Alterations/Additions project in Armadale.

Slab is poured, Swimming pool is built with polished concrete coping and the brickwork and framing is well under way in the race to lock-up by the end of the year. The builders from Ascot Group are doing a great job to keep the project on track.

 

image-3

 

image-4

 

image-2

 

image-5

 

 



CONSTRUCTION PROGRESS – ELSTERNWICK ADDITIONS/ALTERATIONS

New construction site in Elsternwick for an existing contemporary single storey dwelling.

This job will be involving additions such as a WIR and Ensuite to the front master bedroom and at the rear of the property; a private study area with an open plan living/dining and a new kitchen with butler’s pantry and laundry.

These areas will all connect to a spacious, covered outdoor living space.

We can’t wait to see the final result… in the meantime, we all have to be patient!

Previously…

P1020124

Now…

The guys are at frame stage with the windows being installed soon.

Hoddle St 7

 

Hoddle St 4

 

Hoddle St 5

 

Hoddle St 2

 

Hoddle St 1

 

Hoddle St 3

 



CONSTRUCTION PROGRESS – EDITHVALE ALTERATIONS/ADDITION

Last week, our two Directors went for a visit and check out this construction site which involved some alterations and a rear addition to the existing dwelling.

Pictures below were taken before renovation: front house …

Vincent St, Edithvale

 

and backyard…

Vincent St 10

 

and after…

Camp St 8

Camp St 2

Camp St 1

and the rear …

Camp St 7

Camp St 4

Clients are very excited to see the final result (and us too!!) 🙂

 



Construction progress – Hampton New Home

Last Tuesday, one of our Directors sneaked out of the office to whether visiting this construction site or enjoying this perfect warm and sunny day!
Hampton 3

Hampton 5

This new home in Hampton is well under way and most structures are complete. The guys at Custom Edge Homes do a great job!

Happy clients = happy designers.
Hampton 1

Hamtpon 2

Hampton 6a



CONSTRUCTION PROGRESS – CHELSEA NEW HOME

What a beautiful day we had when we visited this site. Sunny view on the beach and the construction progress is going smoothly…. what more can we ask!

See the progress photos below:

photo 1

photo 5

photo 3



Construction Progress for Mornington Renovation

 


Late last June…

Naples Street Early June 001

 


 

Two months later, August 2014:

Mornington 21st Aug 018

072

Kitchen Progress 001

Mornington 21st Aug 020

 



Construction Progress for Bentleigh Addition

Today we visited our Bentleigh Addition, and four months into the build, construction is well under way for this family’s renovation.

This project includes alterations to the rear of the original house, and a new, modern addition for the family’s main living area. This will eventually include a kitchen, pantry, laundry, and a living room that opens up to a deck into the backyard.

wavell 02 wavell 03 wavell 04 By the end, it should hopefully look something like this… Wavell St 0306 FI.jpg